“The selection of Naylor Love as ECI Main Contractor has been vindicated by the successful end result. Naylor Love proved to be well resourced and managed a challenging construction phase very well. We enjoyed working with Naylor Love on this project and found they always went the extra mile to ensure a good outcome.”
“On behalf of S&T and our consultants, it has been a pleasure to work with the Dunedin Naylor Love team on the two recent projects at OCF, where they provided a very professional, pro-active and inclusive approach to project delivery in a secure operational environment.”
“At times there where upwards of 105 contractors on site and Naylor Love co-ordinated all works on site and created a great team culture, which has helped deliver a unique project.
Otago Polytechnic are very happy with the final product and it is great to have students now in the building.”
“…the OBS staff appreciate the considerate way Naylor Love’s team and the many others working on the contract have responded quickly when there have been issues and also communicated superbly, so that we have always known what to be prepared for. The finished product is a testament to the huge effort that has gone into making a renovation in a working building as painless as possible.”
“The completion of the building speaks for itself; the workmanship is to a high standard, any issues or problems were quickly addressed in a positive manner with Naylor Love demonstrating a solutions-driven mandate. We found them to be forward thinking enough to present options to both the client and insurers in order to overcome any difficulties arising during repairs.
This positive outlook and constant engagement with the insurer’s design team and the client’s project team meant that the project was completed on time and under budget which resulted in two clients, insurers IAG and Jacks Point, being highly satisfied with the final outcome.”
“The entire team at Naylor Love worked tirelessly together to ensure that the Rydges Restaurant and Bar Areas were built on time, within budget and that the clients exacting design requirements were met. Their professionalism, collaboration and co-ordination with the many trades involved in this project was exemplary which resulted in quality to finishes and attention to detail to all trades.”
“We were delighted with the quality finishes achieved both inside and out at Hereford Residences. The team at Naylor Love were a pleasure to deal with and were committed to producing the best outcome for the new home owners.
The staff on the ground each day were professional, courteous and a pleasure to deal with. The Naylor Love team should serve as an example of a best practice in the industry.”
“Thanks also to the contractors Naylor Love. Despite slight delays because of the weather the demolition work has gone to plan and they’ve done an exceptional job in controlling the site.”
“Naylor Love built our bespoke dental clinic on 697 Wairere Drive, Hamilton. They have planned and delivered on time to the minute. I cannot recommend them high enough. This is an organisation of excellence, integrity, transparency, character and trust.”
“The Naylor Love team employed on this project have in my opinion provided exceptional management of a technically challenging project, while at the same time maintaining excellent relationships with the Project Manager and Design Team, and the various representatives of HCC (as Principal) who were involved throughout the project – including myself!
Completion of the project was on time (which was critical for Council) and within budget expectations, and the finished project has received an overwhelmingly positive response from Council staff and the general public of Lower Hutt.
Council’s satisfaction with Naylor Love’s performance is perhaps best evidenced by the fact that you have subsequently been engaged on our Town Hall and Events Centre, and Riddiford Gardens upgrade projects, both of which are progressing in the same positive manner.”