Kaikorai Valley College food tech upgrade
Rapid-fire specialist classroom refurbishment.
We are an award-winning construction company that is committed to building long-term relationships with our subcontractors, suppliers and clients. Some of them have been kind enough to give us glowing feedback!
We’ve featured some of our completed projects below, and you can check out our current projects to see what we’re building at the moment.
Sort projects by :
Two-storey extension and alterations in a live hospital.
First New Zealand store for a global boutique ice cream chain.
Design & Build project delivers essential services and amenities buildings.
Communication, cooperation and flexibility the hallmarks of a successful school project.
Translucent ETFE roof transforms a community facility.
Design & Build delivery of a renewable energy asset of national significance.
Rigorous quality procedures implemented at temperature-controlled food distribution facility.
Large proportion of a school rebuilt or refurbished in a two-and-a-half-year project.
Design & build project delivers a bespoke wraparound community facility.
Beautifully executed, heritage-inspired new build offices in Arrowtown.
Limitations of a brownfield site overcome to deliver long-awaited community facilities.
Early Contractor Involvement enhances project planning and delivery.
Flexibility allows retail & hospitality development to evolve as tenants sign up.
Tricky work in tight spaces for a complex strengthening project.
High-tech, high-quality, completed in record time.
Complete transformation of an aging school building.
An expansive community facility packed with sustainable features.
Meticulous preparation, millimetre-perfect construction and a dash of innovation deliver a state-of-the-art facility.
Fast-track fitout and building refurbishment over a live retail environment.
Innovations above and below ground in hospital parking building.
Completed in record time without compromising on quality.
Facilities delivered on time for the busy summer season.
Quick-turnaround office fitout with architectural finishes.
ECI involvement smooths the way for an extensive office refurbishment.
Careful planning and innovative solutions for a project next to a live NICU.
Big box retail store transformed into a youth and community centre.
Major seismic upgrade in a critical live clinical area.
Significant restoration works on a prominent category 1 heritage building.
Seismic strengthening completed with an award-winning, bespoke solution.
Meticulous planning keeps airport roofing project on track.
Refurbishment project spanning 6 levels of a busy hospital.
Heating system replacement through the middle of a busy school.
Tired space converted into a fresh, functional office.
Great relationships maintained over a two-year school rebuild.
Careful monitoring and meticulous planning in a busy hospital.
Seismic strengthening and refurbishment delivered with minimal disruption.
Buildability advice keeps an industrial warehouse development on track.
Minimised disruption with proactive communication and risk management.
Highly technical build with multiple active workfaces, completed over 6½ years.
Bank strengthened and transformed into a fashion retail destination.
High-end fitout for a new Pilates studio in central Dunedin.
Former retail bank transformed with a high-quality health fitout.
Reclad and fitout transforms an aging school block.
High-quality base build and fitout of the first Joe’s Garage restaurant in the Nelson region.
The first phase of a decade-long project to reinstate Christ Church Cathedral.
New Zealand’s first ‘world-leading’ 6 Green Star Design and As-Built rated building.
ECI involvement smooths the way on a unique, highly technical project.
New multi-use social services hub for Christchurch.
Open, collaborative relationship with the client & design team.
Fitout projects for new commercial and health tenancies.
Major school redevelopment completed on time and to an exemplary standard.
Clear communication and early procurement key to keeping the project on track.
Prominent school sports field restored and ready for play, rain or shine.
Smart design enables fast installation and commissioning.
High speed, high quality hotel refurbishment delivered right on time.
Seismic strengthening, restoration and fitout of a century-old building.
Sets a new benchmark for quality buildings in the Queenstown CBD.
ECI input, meticulous planning and early procurement ensures a smooth-running build.
New lift and staircase airside in a live airport terminal.
One of the largest fritted glass canopies in New Zealand creates an outdoor living room.
Re-clad shifts to rebuild in a two-year rural school project.
Former mechanic’s warehouse transformed into a modern retail and restaurant development.
Close collaboration achieves best-for-project outcomes at Hagley College.
Adaptive reuse project transforms a heritage office building into award-winning luxury apartments.
High quality integrated joinery finishes shine within a boutique cinema complex.
3D model used to help medical staff to visualise a new ICU fitout.
Tired library transformed into an award-winning contemporary workspace.
Works carefully planned to avoid disruption to airport operations.
Former council building transformed into an ice cream factory.
New energy centre cuts Christchurch Hospital’s overall carbon emissions in half.
High profile local landmark given a new lease on life in record time.
A collaborative project to complete modular prison units at four sites.
Major redevelopment of ageing school facilities with a strong sustainability focus.
State of the art, high-quality day surgery and endoscopy facility.
Fast track, high-quality inter-tenancy staircase adjustment in an occupied office.
World-class indoor sports centre delivered on time and on budget.
Exceptional workmanship at Dunedin’s only Māori immersion school.
Extensive staged refurbishment project in a live hospital environment.
Late 1960’s era hospital building brought up to standard.
High-quality hotel build kept on track with careful procurement and meticulous planning.
Careful planning gets materials and equipment safely to the top of an occupied multi-storey building.
Fast track retail fitout completed to a high standard in the far south.
An empty shell transformed into a vibrant, user-friendly retail space.
Significant school landmark strengthened and restored.
A three-storey mixed use building with a distinctive aesthetic.
Two high-quality, complex, fast track hospitality fitouts.
Nationwide rental car de-branding project at 39 sites in 10-days.
ECI leads to a smooth-running build in troubled times.
Seismic upgrade and new shop front enhance street appeal in the CBD.
Close collaboration key to coordinating complex services and minimising disruption.
A low maintenance, environmentally friendly school building.
Close collaboration achieves best-for-project outcomes despite the pandemic.
IL4 emergency services equipment store completed on a tight budget.
A technical pool project executed successfully with a collaborative approach.
A state of the art biomedical research and containment facility.
A new university gym, incorporated seamlessly with existing facilities.
Collaborative relationships key to delivering a successful school project.
A highly collaborative project in a challenging live airport environment.
A purpose-built airport facility with space for a growing team.
A collaborative project to build a world class lakeside destination.
Innovative use of engineered timber on a multi-storey apartment building.
New school fitness centre connected to an existing gym.
Over five decades of successful project delivery with extensive ECI input.
Disused office building converted into an airport hotel with a striking faceted façade.
A high-quality shopping centre delivered in record time for a very happy client.
An expansive new level built right on top of an existing shopping centre.
A fast-track fitout to bring Wētā Workshop’s creative vision to life.
Retail yard extension completed for a valued repeat client.
High-quality new bathrooms built in a busy shopping centre on a tight programme.
A complex and fragmented contract spread over three Christchurch prisons.
Luxurious gaming facility for high-rollers completed in a high-stakes live environment.
Built with precision, attention to detail and a focus on acoustic perfection.
A collaborative, high-end fitout for Ngāi Tahu Tourism and Rugby New Zealand.
High-quality office fitout on the top floor of one of Dunedin’s tallest buildings.
Dated 1980’s offices transformed into contemporary workspaces.
Discovery of asbestos fails to derail an important heritage project.
A long-awaited, one-of-a-kind school project – and a Supreme Award winner.
Collaborative approach with both the landlord and tenants resulted in a successful project.
A major design & build contract successfully delivered by Naylor Love.
Challenging seismic upgrade of a 1960’s era in-situ concrete building at Tauranga Hospital.
A two-storey addition integrated into an existing shopping centre.
A five-level car park built in a live retail environment over a busy railway line.
Meticulous craftsmanship on show in a grand, heritage-listed Victorian residence.
Texture and smart lighting used to make up for a lack of natural light.
An economical, fast-track design & build project with five open plan tenancies.
Significant strengthening works staged to minimise disruption to building users.
Built to be strong and sustainable, with extensive buildability input.
Close collaboration with clinical and consultant teams in a 24/7 critical care environment.
53 student apartments designed and delivered in less than a year.
A non-traditional retaining wall, built to follow the natural contours of the hillside.
A state-of-the-art educational facility behind a Category 1 heritage façade.
High-quality office fitout for a security conscious public sector client.
A design & build addition to a high-quality retail development.
A successful re-roofing project in a challenging live environment.
Acoustic isolation completed out of hours with no disruption to the business.
A five-storey apartment block built to 6 Homestar and Lifemark 3 standards.
Meticulous planning and exceptional quality control result in a flagship supermarket.
A stunning, multi-award-winning IL3 airport terminal, built with engineered timber, collaboration and ingenuity.
Involvement from the concept design stage saved the client both time and money.
High-rise, base isolated, low damage design apartment building.
A stunning ETFE roof canopy transforms a shopping precinct at Botany Town Centre.
Meticulous architectural design implemented on site with precision and an absolute focus on quality.
Exceptional new build and refurbishment projects.
Attention paid to methodology and detailing produces a high-end mixed-use building.
A large mixed-use town centre development forms the heart of a growing coastal community.
Early contractor involvement and ingenuity extends the life of a key public facility.
A brand new, eco-friendly home for some very special residents.
Major civil works right around the perimeter of an operational aged care facility.
A complex three-level commercial & retail structure on a challenging site.
Tricky column remediation project 70 metres above a busy road in the Auckland CBD.
Careful management limits disruption to the public, traffic & other tenants.
Shoppers’ access maintained with shifting network of hoarded pathways.
Airport terminal extended and strengthened to IL3 in a live environment.
A new look flagship supermarket in a prominent central city location.
Careful planning expedites a new breed of prefabricated classroom.
A practical build on a steep site provides plenty of space for learning and play.
Fast-track, crowd-funded conversion of a furniture factory into a craft chocolate factory.
Upgrade of the chimpanzee habitat and people spaces at Wellington Zoo.
Three blocks of stunning new student accommodation in the heart of Auckland.
A stunning roof-top swimming pool completed right in time for summer.
A light, bright, fast track fitout designed to enhance staff and client security.
A five-storey mixed use development in Queenstown’s Five Mile Centre.
A new five-level parking building with environmentally-friendly features.
Acoustic perfection in new school music block, triple-lined to keep the noise in.
An attractive single-storey retail centre built on a carefully decontaminated site.
Extensive refurbishment of a boutique shopping centre, which stayed open throughout.
Fast-track library fitout, completed on time and on budget.
1940’s era state housing re-purposed as bright, modern student accommodation.
Five storey apartment building with basement car parking at Hobsonville Point
A high-quality prison building in a high security environment.
Landscaping and new community amenities in a popular inner-city park.
A complex civil and paving project completed in a busy live public environment.
Complex earthquake remediation and roof replacement project.
Extra capacity added to a live hospital ICU, staged to minimise disruption.
Careful combination of old & new results in a thoroughly modern civic & events facility.
New chairlift and track upgrades at Skyline Queenstown’s iconic luge.
An updated, energy efficient centrepiece for Wellington’s art scene.
An industrial building constructed over and around a fully operational fertiliser works.
Communication was key in a world class, state-of-the-art medical fit-out.
A historic building strengthened and rejuvenated for 21st century tenants.
Refurbishments and new builds at the Otago Corrections Facility.
A small but significant memorial project at Pukeahu War Memorial Park.
Meticulous re-purposing and restoration of a historic port building.
Every millimetre and every moment used to build a new backpacker hotel.
Design & build student accommodation with extensive prefabricated components
A stunning new head office built right on the waterfront in a busy port.
A groundbreaking engineered timber building, completed in just 15 months.
A luxury apartment building in a stunning seaside location with ECI involvement.
A carefully considered facelift delivers a warmer, drier, safer & more welcoming building.
A two-storey aged care facility with 69 suites and 16 serviced apartments.
An unwavering focus on quality, sustainability, programme & budget.
Delivered right on time for the critical pre-Christmas trading period.
A heritage listed façade saved with a functional and viable solution.
Detailed planning allowed construction to progress with minimal disruption.
Beautifully executed interiors, complete with the signature QT quirks.
Exterior refurbishment of a significant Wellington sporting landmark.
A weathertightness remediation project in a live school environment.
Top-quality refurbishment of New Zealand’s most famous building.
Complex integration of an existing pool into a new leisure facility.
A mixed-use office and retail development at Remarkables Park.
A technically complex mixed-use development in the heart of Wellington.
An elaborate restaurant fitout completed to uncompromising quality standards.
High-quality, Totara-themed office fitout for a discriminating client.
An office building converted into a high quality apartment & office development.
A stunning & functional open-plan modern learning environment.
Full-team collaborative planning kept this major retail development on track.
Completed to the high safety standards required by Wellington City Council.
60-year-old accommodation block refurbished for a new generation of students.
State of the art dental practice installed in a commercial building.
Stunning transformation of a workshop into a hairdressing and beauty training centre.
Heritage building strengthened and modernised without losing any of its character.
Massive extension to a retail distribution centre.
Demolition undertaken as quickly as possible without compromising safety.
Roof replacement over 28 different levels in a fully operational hospital.
An indoor leisure pool complex and fitness centre adjacent to QBE Stadium.
A collaborative, all-team approach results in a defect-free handover.
Award-winning bar and restaurant refurbishment in an operational hotel.
A beautifully detailed replica heritage façade on a seismically strong new building.
High-quality, bespoke restaurant fitouts completed in a tight timeframe.
Close collaboration leaves the client plenty of time to stock the shelves.
Multiple work faces successfully managed in a high security environment.
New classroom and administration block with links to existing buildings.
High-spec residential development completed to exemplary quality standards.
Extensive remediation of a partially occupied apartment building.
New pump house built over operational pumps right on the wharf edge.
An award-winning IL4 level hospital facility built on a challenging site.
Major reconfiguration of SkyCity’s multi-storey main entrance.
Extensive seismic strengthening in a fully operational power house.
Highly detailed finishes achieved with ingenuity and persistence.
A “modern learning environment” school in the heart of Lyttelton.
Live food production environment adjacent to a busy railway line.
A challenging leaky building remediation project with escalating scope.
A base isolated multi-storey building with ground-source heating and cooling.
Dated council offices transformed into a modern working environment.
Completed on time for the new school year despite considerable growth in scope.
Demolition, façade retention and earthworks in a live school environment.
Value engineering and meticulous planning brings an ambitious project in on budget.
Close collaboration with the wider community key to project success.
Seismic strengthening and refurbishment in a Category 1 historic building.
Mitre 10 Mega store built on a fast-track programme in less than a year.
Fast track, high quality refurbishment in an operational luxury hotel.
Fast track industrial project in a hygienic food production environment.
Pre-construction involvement assisted with buildability and budget.
Base-isolated four-storey office building and basement car park.
Award-winning strengthening & restoration of listed school buildings.
Careful planning and close collaboration deliver excellent results.
A world-class aquatic and recreation centre delivered on time and on budget.
High-spec floor-by-floor refurbishment of an occupied five-star hotel.
A multi-award-winning, hugely popular library featuring engineered timber.
A design & build project showcasing construction techniques and materials.
Refurbishment of an operational airport lounge.
A great team effort resulted in a safe and successful project in a live environment.
Design flows effortlessly over to construction in a design & build project.
Solutions-focus leads to quick identification and resolution of design issues.
Category one historic theatre restored to its pre-earthquake condition.
A complex, cutting-edge structure featuring engineered timber.
Several stages of extensions and redevelopments in a live retail environment.
A giant kitchen complex with the capacity to prepare 20,000 in-flight meals every day.
A superb new community facility with environmentally friendly features.
Outstanding project delivery in an occupied building on a challenging site.
Significant seismic strengthening project in the Wellington CBD.
Works focused on providing an improved shopping experience without causing disruption.
Fast-track construction of a huge warehouse extension.
A relocated airport terminal building transformed into an eye-catching café.
Large format retail design & build involving complex geotechnical remediation.
1930s-era port shed transformed into council offices on a fast-track programme.
A long-term relationship built on collaboration and high-quality projects.
A complex restaurant project delivered on time for a top hospitality client.
Completed to a fast track programme and handed over right on time for WOW.
Innovative methodology de-risked the project with significant offsite fabrication.
One of Christchurch’s iconic post-quake tourist destinations.
Complex heritage re-build involving 22 owners and four insurance companies.
Tricky access issues overcome with helicopters and abseil harnesses.
New drinking water reservoir in the hills high above Christchurch.
Sets a new standard for surf lifesaving club amenities in New Zealand.
Design & build project promotes buildability and ensures price certainty.
Specialist concrete work completed in a challenging live environment.
Student pub converted into a study centre & social hub in just 28 weeks.
Extensive pre-construction involvement resulted in a smoother build process.
The first controlled building demolition by explosives in New Zealand.
Designed and built to stand up to hard wear and a corrosive environment.
A series of developments incorporating environmentally sustainable features.
Designed and built to environmentally sustainable design principles.
Off-site fabrication fast-tracks temporary operating theatres at Hutt Hospital.
Extensive programme of new builds and renovations in a live hospital environment.
An array of cultural, geological, heritage & archaeological issues successfully overcome.
Only 12 months from foundation works to milk powder production starting.